Energy storage BESS / Under development

Ypyrinneva BESS

Kuortane – Finland
Ypyrinneva BESS
Est. 12 MW Total capacity
Est. 2026 To be operational

Background

Ilmatar is preparing an energy storage project in connection with the Ypyrinneva solar project. The power of the energy storage system is 12 MW and the energy storage capacity is 24 MWh. The storage is located in the Ypyrinneva solar farm area, next to the farm’s substation. By placing the energy storage close to the solar farm, the already existing infrastructure can be utilized for multiple purposes.

The energy storage can balance the production variation typical for renewable energy. In addition, the system can balance the frequency variation of the network, so that the electricity transmission network reliability remains at a good level. The lifetime of the system is about 15 years, after which the lifetime can be extended by changing the storage modules.

Project location

Contact

Contact me if you need more information about this project.

Lauri Vierto

Team Lead

Ilmatar

+358 50 376 5204 lauri.vierto@ilmatar.com

News & Views