Vornankorpi (Kuopio)
Kuopio – Finland
Est. 37.5 MW
Total power
Max. 5
Number of turbines
Max. 225 / 320 M
Hub height / Tip height
Est. 2028
To be operational
Ilmatar is preparing the Vornankorpi wind farm of about 37,5 MW nominal capacity with 5 wind turbines in the city of Kuopio. Wind turbines with a maximum tip height of 320 m are planned for the area.
The planned start of construction of the Vornankorpi wind power project is around 2025-2026 and the start of production is around 2028.